Will the bag hold buffer or transfer it to the next step?
For holding, define fill volume, contact time and temperature. For transfer, review filling and drainage orientation and the downstream connection. Confirm working volume for the selected assembly.
02
Which wetted components will change from your current assembly?
Compare the drawing and component list for the film, ports, tubing and connectors. Verify wetted materials and connection dimensions for the actual components.
03
Which evidence covers this exact configuration?
Request the sterilization status, leak-test information, and the scope of material and extractables/leachables evidence. Supplier documentation supports qualification in the intended process.
Use the flat-bag drawing to expose hidden batch losses
Relevant manufacturer: 3CON Pharma Medical GmbH
The problem on site
Matching port count can look like a drop-in replacement, but a changed port direction or mounting height alters tubing routes, residual volume and the operator's connection sequence.
Proposed solution
Compare front and side drawings for support orientation, fill/drain ports, tubing length and connection positions. Check hand access and retained liquid before relying on a nominal volume match.
What to verify before selection
Compare film suitability, sterilisation records, working volume and assembly access with the site layout. Review handling and drainage with a representative configuration when needed.
Visitor analytics
May we use Google Analytics, Google Ads and ChatGPT Ads for visitor and advertising measurement? Learn more